| 秦山核电二期工程 |
|
建设中的秦山核电二期扩建工程 |
|
筹备中的核电项目 |
| 秦山核电二期工程,是我国自主设计、自主建造、自主管理、自主运营的首座2×600万千瓦商用压水堆核电站,它是国家“九五”期间唯一采用“以我为主、 |
| 中外合作”方式建设的国产化核电项目。它成功地吸收、借鉴了国内外核电设计、建造的先进经验,采用了当今世界上技术成熟、安全可靠的压水堆型,设备国产 |
| 化率达到了55%。由我公司承建的秦山二期核电站2#机组工程质量、安全、进度均能够满足需要,并创造了核岛主体施工周期最短、穹顶吊装时间最短两项国内核 |
| 电建设的新纪录。 |
| Qinshan Nuclear Power Project (NPP) Phase II is the first commercial pressurized-water reactor with capacity of 2×600MW which was |
| designed, constructed, managed and operated on our own. It is the only localized nuclear project built through the guideline of “rely on |
| own efforts and corporate with other countries” during the 9th Five-year Period Plan (a general plan for economic development in China). |
| It has successfully absorbed advanced experiences of nuclear design and construction both home and abroad by taking pressurized-water |
| reactor technique which is safer than before. It’s designed and built in the light of the international standard to adopt two loops with |
| capacity of 300MW each. Its rate reached up to 55 percent. The second unit of Qinshan NPP Phase II constructed by the corporation can meet |
| the requirements in quality, safety and schedule. It has created two new records of nuclear power construction in domestic, i.e.---the |
| shortest construction cycle of main structure of the nuclear island and the shortest hoisting period of dome. |
 |
|
 |
|
 |
| 秦山二期2#核岛第一罐混凝土浇筑现场 |
|
穹顶混凝土浇注 |
|
龙门架全景 |
 |
|
 |
|
 |
| 秦山二期2#核反应堆厂房穹顶吊装 |
|
2#核岛内部结构4.65m板钢筋绑扎 |
|
钢衬里“牛腿”吊装 |
 |
|
|
|
|
| 预应力施工工程 |
|
|
|
|